Emergency Centre Delivered in 12 Weeks for Yorkshire Council - Vector Space Modular

The Challenge

The council's existing emergency centre suffered significant damage during severe weather, leaving them without a proper facility to coordinate r nses to local incidents and emergencies. With winter approaching and the increased risk of flooding and severe weather events, they needed a replacement facility operational within three months. The new centre required sophisticated communications equipment, multiple operational rooms, secure storage areas, and 24/7 accessibility, all whilst maintaining budget constraints and planning requirements. Traditional construction methods would have taken 18-24 months, far too long for such a critical service.

Our Solution

Vector Space Modular designed and manufactured a b ke two-storey modular emergency centre featuring a main control room, briefing areas, secure communications suite, staff facilities, and backup power systems. Our off-site construction approach allowed us to begin manufacturing whilst site preparations were completed, significantly reducing the overall timeline. The modules incorporated advanced soundproofing, enhanced security features, and flexible internal layouts to accommodate various emergency scenarios. All electrical and data infrastructure was pre-installed and tested before delivery, ensuring seamless integration of the council's existing communication systems. Modular government building - Emergency centre project in Yorkshire

The Results

The emergency centre was delivered on schedule and became operational just 12 weeks after contract award, enabling the council to maintain full emergency r nse capabilities throughout the critical winter period. The facility has successfully coordinated r nses to over 200 incidents in its first year, including major flooding events and severe weather warnings. Energy efficiency measures resulted in 35% lower running costs compared to the previous facility, whilst the flexible modular design allowed for future expansion capabilities. Staff satisfaction increased significantly due to improved working conditions and modern facilities.

Explore More

Project Details

Duration
12 weeks
Building Size
380
Project Value
750000
Location
Harrogate, North Yorkshire
Service
Modular Building Sale