The Challenge

The trust faced critical bed shortages during winter pressures and needed additional ward capacity urgently. Traditional construction would have taken 18+ months, which was unacceptable given patient safety concerns.

Our Solution

Vector Space Modular designed and manufactured a complete 40-bed ward extension off-site while simultaneously preparing the hospital grounds. The building was delivered in modules and assembled over a single weekend to minimise disruption to hospital operations.

The Results

The ward was operational within 16 weeks of contract signing — 80% faster than traditional construction. The facility has received excellent feedback from staff and patients, with infection control rates matching the main hospital building.

Explore More

Project Details

Duration
16 weeks
Building Size
1,800
Project Value
£3.2m
Location
Southern England
Sector
Service
Modular Building Sale