The Challenge
The client faced an urgent capacity crisis as their existing data centre reached maximum utilisation, with new enterprise clients requiring guaranteed uptime and enhanced security. Traditional construction would take 12-18 months, risking significant revenue loss and potential client defection. The site in Harrogate had limited space and required a solution that could be delivered quickly whilst maintaining the highest standards of power redundancy, cooling systems, and physical security essential for mission-critical operations.
Our Solution
Vector Space Modular designed and manufactured a cutting-edge modular data centre comprising multiple interconnected modules with integrated power distribution, advanced cooling systems, and comprehensive fire suppression.

Our off-site construction approach enabled simultaneous ground preparation and module fabrication, incorporating N+1 power redundancy, precision air conditioning, and Tier 3 specifications throughout. The modular design included dedicated server halls, network operations centre, and secure entry systems, all delivered with minimal disruption to existing operations.
The Results
The project delivered a 320% increase in server capacity whilst achieving 99.99% uptime targets and PUE efficiency of 1.4. The client secured three major new enterprise contracts worth £2.1 million annually within six months of completion. Energy consumption per rack decreased by 28% compared to their legacy facility, and the modular design provides seamless expansion capability for an additional 200 racks when required.